{"id":2064,"date":"2026-09-14T11:36:00","date_gmt":"2026-09-14T11:36:00","guid":{"rendered":"https:\/\/yajuwood.com\/?p=2064"},"modified":"2026-09-20T06:37:14","modified_gmt":"2026-09-20T06:37:14","slug":"high-rise-commercial-residential-tower-concrete-formwork-dubai-uae","status":"publish","type":"post","link":"https:\/\/yajuwood.com\/ar\/high-rise-commercial-residential-tower-concrete-formwork-dubai-uae.html","title":{"rendered":"\u0642\u0648\u0627\u0644\u0628 \u0627\u0644\u062e\u0631\u0633\u0627\u0646\u0629 \u0644\u0623\u0628\u0631\u0627\u062c \u062a\u062c\u0627\u0631\u064a\u0629 \u0648\u0633\u0643\u0646\u064a\u0629 \u0634\u0627\u0647\u0642\u0629 \u0627\u0644\u0627\u0631\u062a\u0641\u0627\u0639 \u2014 \u062f\u0628\u064a\u060c \u0627\u0644\u0625\u0645\u0627\u0631\u0627\u062a \u0627\u0644\u0639\u0631\u0628\u064a\u0629 \u0627\u0644\u0645\u062a\u062d\u062f\u0629"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Location: Middle East \u00b7 Dubai, United Arab Emirates<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Supplied Products: 18mm Black\/Brown Phenolic Film Faced Plywood (Full Birch\/Pine Core, Dynea Phenolic WBP Glue, 72-Hour Boiling Water Proof, Smooth Film Surface).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Project Scope: Concrete formwork for a 45-story high-rise tower complex. Total supply of 28 x 40&#8217;HQ containers (approx. 42,000 standard panels).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Key Specs: WBP Phenolic Glue \/ 18mm Birch&amp;Pine Core \/ Desert High-Temp Resistance \/ 15+ Reuse Cycles<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Value Delivered: Maintained exceptional dimensional stability in extreme desert temperatures exceeding 45\u00b0C. Achieved 18\u201320 reuses per panel with mirror-like concrete finish, significantly reducing post-casting plastering costs.<\/p>","protected":false},"excerpt":{"rendered":"<p>Location: Middle East \u00b7 Dubai, United Arab Emirates Supplied Products: 18mm Black\/Brown Phenolic Film Faced Plywood (Full Birch\/Pine Core, Dynea Phenolic WBP Glue, 72-Hour Boiling Water Proof, Smooth Film Surface). Project Scope: Concrete formwork for a 45-story high-rise tower complex. Total supply of 28 x 40&#8217;HQ containers (approx. 42,000 standard panels). Key Specs: WBP Phenolic [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":2083,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","footnotes":""},"categories":[115],"tags":[],"class_list":["post-2064","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cases"],"acf":[],"_links":{"self":[{"href":"https:\/\/yajuwood.com\/ar\/wp-json\/wp\/v2\/posts\/2064","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yajuwood.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yajuwood.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yajuwood.com\/ar\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/yajuwood.com\/ar\/wp-json\/wp\/v2\/comments?post=2064"}],"version-history":[{"count":1,"href":"https:\/\/yajuwood.com\/ar\/wp-json\/wp\/v2\/posts\/2064\/revisions"}],"predecessor-version":[{"id":2066,"href":"https:\/\/yajuwood.com\/ar\/wp-json\/wp\/v2\/posts\/2064\/revisions\/2066"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/yajuwood.com\/ar\/wp-json\/wp\/v2\/media\/2083"}],"wp:attachment":[{"href":"https:\/\/yajuwood.com\/ar\/wp-json\/wp\/v2\/media?parent=2064"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yajuwood.com\/ar\/wp-json\/wp\/v2\/categories?post=2064"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yajuwood.com\/ar\/wp-json\/wp\/v2\/tags?post=2064"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}